So we are finally getting around to fixing some things that were damaged in the water leak. The hardwood floor still needs some more time to dry out. I can't believe how long that takes. The basement is still untouched, but we'll get to it after Christmas. We did do the laundry room though (only because they told us that we had to come in and pick flooring out or they wouldn't do it.) I guess a little nudge is what you need sometimes. If it wasn't the holidays, we probably would have been more on top of it, I just didn't feel it was on top of the priority list; oh well. It is done now, and I love how it turned out. Here are some before and after shots.
Right after they ripped out all the flooring.
The final look.
This is the tile we picked out. Andrew did a good job. He has good taste.
I had to repaint the bakers rack too. I couldn't put it back into the new laundry room without touching it up. I love how it turned out. Now I just want to redo the cabinets. I guess that can wait until after Christmas.
No comments:
Post a Comment